Case Studies

Infosys’ Application Health Management System

July 26, 2013

The Problem: Applications deployed and in regular use need continuous monitoring on different dimensions for design robustness, run time behaviour and maintainability. Infosys Information System Department contains more than 200 ...

GITAM University, Visakhapatnam’s Campus-Wide Network Infrastructure

July 26, 2013

[image_library_tag 724/82724, style="float: left;" alt="jjk-80x80" ,default] Project Specs Industry: Education Implementation Partner: Cisco Deployment Location: Visakhapatnam

Bharat Petroleum Corporation’s Infrastructure Virtualization

July 26, 2013

Project Specs Project Head: Pramod Bhatnagar, DGM-IT Industry: Petroleum Energy Implementation Partner: Dell India Pvt. Ltd. ...

Kaya’s New Application Rollout for Kaya Clinic Operations

July 26, 2013

The Problem: With more than 15 minutes to complete a billing transaction for a client, the erstwhile solution was unacceptable to the business. So, they decided to rollout a new ...

Mahindra Navistar Automotives’ Mechanics’ Mecaknow

July 26, 2013

The Problem: They wanted a better platform for evaluating mechanics at their various dealerships. This included conduction and supervision of tests, result declarations, competency measures, notifications, uploading manpower data, conducting ...

Mahindra & Mahindra’s Advanced Database Compression of ERP System Running on Oracle 11g R2

July 26, 2013

The Problem: Their global ERP system is hosting more than 65+ group companies on SAP. When the system went live the ERP database size was nearly 750 GB. As the system ...

L&T Infotech’s SAP Technical Factory

July 26, 2013

[image_library_tag 293/82293, style="float: left;" alt="koysdu" width="163" height="199" ,default] Project Specs Industry: IT Implementation Partner: SAP Technical BAU ...

ICICI Bank’s Bank Bazaar App

July 26, 2013

[image_library_tag 298/82298, style="float: left;" alt="ghhfj" ,default] Project Specs Industry: Banking Implementation Partner: Bank Bazaar Deployment ...

ICICI Bank’s FCRM Lighter Version

July 26, 2013

[image_library_tag 285/82285, style="float: left;" alt="uyt" ,default] Project Specs Industry: Banking Implementation Partner: In-house Deployment Location: ICICI ...

MindLance India’s Collaboration & Communication Cloud Project

July 26, 2013

[image_library_tag 707/82707, style="float: left;" alt="jhuytyu" ,default] Project Specs Industry: Information Technology Implementation Partner: Mindlance India Pvt limited) ...

State Bank of India’s TDR-STDR Through Automated Teller Machines

July 26, 2013

The Problem: Their quest for customer service actually led to the development of this service. SBI branches always have very high footfalls and they have numerous customers who visit the ...

Mangla Engineering’s iON Implementation for Process Automation

July 26, 2013

[image_library_tag 295/82295, style="float: left;" alt="jjujt" ,default] Project Specs Industry: Manufacturing Implementation Partner: Tata Consultancy Services ...

Mahindra Vehicle Manufacturers’ Process Control Network Re-Engineered

July 26, 2013

The Problem: The existing process control network used to face major breakdowns due to frequent failures in the control network, which were primarily due to multiple stakeholders/ vendors handling discrete ...

Mahindra Two Wheelers’s Dealer Management System

July 26, 2013

[image_library_tag 288/82288, style="float: left;" alt="kyu" ,default]  Project Specs Industry: Automotive Implementation Partner: Excellon Software Private Ltd

Mahindra Navistar’s eManual

July 26, 2013

The Problem: Mahindra Navistar was dealing with physical service manuals to do knowledge transfer to mechanics and service executives on the field. The traditional issuance of service manuals was time-consuming ...

Mahindra & Mahindra, Tractor Division : Online Manpower Deployment on Production Line

July 26, 2013

The Problem: The tractor-producing plant was running three shifts for their production. The shift officer has to deploy the workmen on the stages of the production line at the start ...

How Mahindra & Mahindra’s IT enabled Vehicle Management System Helped Them Better Handle the Vehicle Inventory

July 26, 2013

Project Specs Project Head: Vikas Mestry, Sr. Manager, Design Solutions Industry: Manufacturing Implementation Partner: Nibana Solutions Deployment Location: ...

Mahindra & Mahindra’s IT enabled SOR to VOB process

July 26, 2013

Project Specs Project Head: Vikas Mestry, Sr. Manager, Design Solutions Industry: Manufacturing Implementation Partner: Nibana Solutions ...

Mahindra and Mahindra’s Audit Process Automation

July 26, 2013

The Problem: The Corporate Management Services (CMS) team is responsible for internal audit assignments in 63 companies, which include 10 listed companies. After an internal audit is completed and the ...

Infosys’ iClaim-Claims Processing Solution

July 26, 2013

[image_library_tag 291/82291, style="float: left;" alt="lklkj" ,default]  Project Specs Industry: IT Company Implementation Partner: In-house project. Deployment ...