Reliance Infrastructure Ltd. had been bearing tangible and intangible losses
due to higher electricity network downtime and delayed supply restoration during
abnormal fault conditions due to manual processes in identifying the faulty
cable section, inaccessible remotely located substations during contingent
situations like heavy downpour, flood, riot, earthquake etc. Also there was lack
of central monitoring through a manageable network, sabotage attempt at the sub
stations during labour unrest/strikes, higher wear and tear of the switchgears
due to breakdown maintenance, thus reducing the overall life of the switchgears.
This led to higher replacement cost of the faulty switchgears. To address these
problems, RInfra has deployed Network Management System comprising of
Distribution Management System and Equipment Monitoring System. The benefits
which have been accrued by Reliance Infrastructure after deployment of the
project include higher electrical network uptime, optimum utilization of
manpower for value added services to the customer, reduced time for fault
identification and restoration, reduced customer service costs, and reduced
carbon emissions. This also helped the company to achieve optimum loadability of
the distribution transformers, elimination of human workforce to operate
11KV/33KV switchgear, and in outage management.
Project Specs |
||||
|
|
|||
Implementation Partner ABB and Microtechnologies (India) |