Case Studies

Infosys’ Automating Asset Management to Save 3833 Person Days of Effort

July 26, 2013

[image_library_tag 297/82297, style="display: block; margin-left: auto; margin-right: auto;" alt="jhghj" ,default] Project Specs Industry: IT Company Implementation Partner: ...

ICICI Lombard GIC : Online Approvals for Health Claims E-CASHLESS OPD/IPD

July 25, 2013

The Problem: This project aims at bringing the provider network into the platform designed by ICICI LOMBARD GIC, which enables seamless communication between the insurance company and the hospitals. This ...

State Bank of India : BI @ SBI

July 25, 2013

The Problem: The biggest challenge was to integrate data from diverse sources into timely and reliable actionable information, which would give insight and foresight and enable the top management and ...

S.M.I.L.E Microfinance’s BR.NET Implementation

July 25, 2013

The Problem: The current IT system was decentralized and had to be converted to a centralized system and the legacy systems had to be automated. A Core Banking System(CBS) had ...

Planning Department, Government of UP’s Integrated SPIDER & e-MANCHITRA Geo Portal

July 25, 2013

The Problem: To overcome the maladies affecting the manual system of data collection at grass roots level and increase the efficiency, transparency, and visualization in Governmental units. The Solution: SPIDER (Sankhyikiya ...

Mahindra Navistar Engines’ Kaseya Application

July 25, 2013

The Problem: Mahindra Navistar Engines wanted to implement a call logging system for IT related problems, along with Problem Management, Change Management, Release Management and IT Automation and give the ...

Mahindra & Mahindra’s Quality Data Management System

July 25, 2013

  [image_library_tag 304/82304, style="float: left;" alt="Afds" ,default] Project Specs Industry: Automobile Implementation Partner: In   House Deployment Location: Mahindra  ...

Info Edge’s Newgen Resumepedia

July 25, 2013

The Problem: The 5 core processes of "resume writing", "cover letter", "application writing" and "info graphic resume writing" were haphazard without a proper workflow management system to track them. Also, ...

IndiaFirst Life Insurance’s MagicBoard Customer Module

July 25, 2013

The Problem: They faced several issues like increase in "call for requirement or incomplete" cases, which had resulted into customer inconvenience and increase in processing cost, as well as dependence ...

Godrej Consumer Product’s Daksh Sales Analytics

July 25, 2013

The Problem: All consumer product division stakeholders were grappling to get more insights from data. The execution teams have traditionally relied upon intuition and experiential knowledge to take decisions. One ...

Govt. of Maharashtra’s SMS Based Notification of Public Welfare Schemes

July 25, 2013

An SMS gateway was designed and implemented in few districts in Maharashtra to start with. This is a very low-cost solution and can be configured as per the need of ...

Birla Institute of Technology and Science’s BITS Connect 2.0

July 25, 2013

Birla Institute of Technology and Science has four geographically distributed campuses and there was a need to connect all of them tightly for pedagogic and administrative reasons. It was also ...

Mahindra Vehicle’s Paintshop Robotics Systems

July 25, 2013

The robotic systems in paint shops at Chakan (Of Mahindra Vehicle Manufacturers) often caught viruses that resulted in major losses of production. Every time, the technical engineer from Germany had ...

Mahindra Vehicle Mfg Ltd’s Visitor Authentication & Management System

July 25, 2013

Mahindra Vehicle Manufacturers Ltd had around 300+ visitors visiting 24 production units every day for day to day transactions. It was cumbersome to manually track all the visitors and authenticating ...

ICICI Bank’s Mobile Based Automation of Payment Collections

July 25, 2013

The debt servicing process involves collecting payments from delinquent customers, issuing a payment receipt and updating the bank records for the same. ICICI Bank collects payments from its delinquent customers ...

SBI’s HR Mgmt System

July 25, 2013

The State Bank Group was facing many issues and challenges, which were required to be resolved. The Banks' rules/ service conditions were being interpreted differently by different Sanctioning Authority and ...

Mahindra Navistar Automotives’ CAD Data Release Process

July 23, 2013

CAD Data was getting validated through verbal means or email, and keeping track of the validations was proving to be very difficult. Although the design team had methods to keep ...

Infosys’ One-A-Quarter-Planned-Maintenance

July 23, 2013

The company had to grapple with suboptimal utilization of human and system resources, plus there was a high cost of downtime and other demerits as well. Hence the need to ...

ICICI Lombard Online E-Commerce Portal

July 23, 2013

While ICICI Lombard always had an online presence, they needed a more sophisticated online platform that would provide consistent and fantastic user experience to users. Also, the existing platform did ...

Government Of Maharashtra’s MahaGov Cloud

July 23, 2013

The Maharashtra State Government was facing several challenges that demanded a cloud solution. Firstly, users were facing long waiting times to procure IT infrastructure as they had to schedule to ...