Case Studies

L&T Infotech’s SAP Technical Factory

July 26, 2013

[image_library_tag 293/82293, style="float: left;" alt="koysdu" width="163" height="199" ,default] Project Specs Industry: IT Implementation Partner: SAP Technical BAU ...

ICICI Bank’s Bank Bazaar App

July 26, 2013

[image_library_tag 298/82298, style="float: left;" alt="ghhfj" ,default] Project Specs Industry: Banking Implementation Partner: Bank Bazaar Deployment ...

ICICI Bank’s FCRM Lighter Version

July 26, 2013

[image_library_tag 285/82285, style="float: left;" alt="uyt" ,default] Project Specs Industry: Banking Implementation Partner: In-house Deployment Location: ICICI ...

MindLance India’s Collaboration & Communication Cloud Project

July 26, 2013

[image_library_tag 707/82707, style="float: left;" alt="jhuytyu" ,default] Project Specs Industry: Information Technology Implementation Partner: Mindlance India Pvt limited) ...

State Bank of India’s TDR-STDR Through Automated Teller Machines

July 26, 2013

The Problem: Their quest for customer service actually led to the development of this service. SBI branches always have very high footfalls and they have numerous customers who visit the ...

Mangla Engineering’s iON Implementation for Process Automation

July 26, 2013

[image_library_tag 295/82295, style="float: left;" alt="jjujt" ,default] Project Specs Industry: Manufacturing Implementation Partner: Tata Consultancy Services ...

Mahindra Vehicle Manufacturers’ Process Control Network Re-Engineered

July 26, 2013

The Problem: The existing process control network used to face major breakdowns due to frequent failures in the control network, which were primarily due to multiple stakeholders/ vendors handling discrete ...

Mahindra Two Wheelers’s Dealer Management System

July 26, 2013

[image_library_tag 288/82288, style="float: left;" alt="kyu" ,default]  Project Specs Industry: Automotive Implementation Partner: Excellon Software Private Ltd

Mahindra Navistar’s eManual

July 26, 2013

The Problem: Mahindra Navistar was dealing with physical service manuals to do knowledge transfer to mechanics and service executives on the field. The traditional issuance of service manuals was time-consuming ...

Mahindra & Mahindra, Tractor Division : Online Manpower Deployment on Production Line

July 26, 2013

The Problem: The tractor-producing plant was running three shifts for their production. The shift officer has to deploy the workmen on the stages of the production line at the start ...

How Mahindra & Mahindra’s IT enabled Vehicle Management System Helped Them Better Handle the Vehicle Inventory

July 26, 2013

Project Specs Project Head: Vikas Mestry, Sr. Manager, Design Solutions Industry: Manufacturing Implementation Partner: Nibana Solutions Deployment Location: ...

Mahindra & Mahindra’s IT enabled SOR to VOB process

July 26, 2013

Project Specs Project Head: Vikas Mestry, Sr. Manager, Design Solutions Industry: Manufacturing Implementation Partner: Nibana Solutions ...

Mahindra and Mahindra’s Audit Process Automation

July 26, 2013

The Problem: The Corporate Management Services (CMS) team is responsible for internal audit assignments in 63 companies, which include 10 listed companies. After an internal audit is completed and the ...

Infosys’ iClaim-Claims Processing Solution

July 26, 2013

[image_library_tag 291/82291, style="float: left;" alt="lklkj" ,default]  Project Specs Industry: IT Company Implementation Partner: In-house project. Deployment ...

Infosys’ Automating Asset Management to Save 3833 Person Days of Effort

July 26, 2013

[image_library_tag 297/82297, style="display: block; margin-left: auto; margin-right: auto;" alt="jhghj" ,default] Project Specs Industry: IT Company Implementation Partner: ...

ICICI Lombard GIC : Online Approvals for Health Claims E-CASHLESS OPD/IPD

July 25, 2013

The Problem: This project aims at bringing the provider network into the platform designed by ICICI LOMBARD GIC, which enables seamless communication between the insurance company and the hospitals. This ...

State Bank of India : BI @ SBI

July 25, 2013

The Problem: The biggest challenge was to integrate data from diverse sources into timely and reliable actionable information, which would give insight and foresight and enable the top management and ...

S.M.I.L.E Microfinance’s BR.NET Implementation

July 25, 2013

The Problem: The current IT system was decentralized and had to be converted to a centralized system and the legacy systems had to be automated. A Core Banking System(CBS) had ...

Planning Department, Government of UP’s Integrated SPIDER & e-MANCHITRA Geo Portal

July 25, 2013

The Problem: To overcome the maladies affecting the manual system of data collection at grass roots level and increase the efficiency, transparency, and visualization in Governmental units. The Solution: SPIDER (Sankhyikiya ...

Mahindra Navistar Engines’ Kaseya Application

July 25, 2013

The Problem: Mahindra Navistar Engines wanted to implement a call logging system for IT related problems, along with Problem Management, Change Management, Release Management and IT Automation and give the ...